Ir Yeu may consider appointments worldwide. To date, he has been appointed as sole arbitrator, adjudicator and mediator in Hong Kong, Malaysia and Australia. The types of disputes on which he has served as arbitrator, adjudicator and mediator include main contract, subcontract and professional services disputes arising under traditional, design and build and bespoke contracts. He may provide services under the Construction Industry Security of Payment Ordinance (Cap. 652) in Hong Kong.
- Binnies
- Senior Resident Engineer
Design and build contract
Early contractor involvement
Yuen Long Barrage and Nullah Improvement Schemes
(Contract Sum: HK$3,003 Millions – ~GBP300 Millions)
The main objectives of the works are to bring the flood protection level of Yuen Long Town Centre to the required standard. It also provides the opportunity to revitalize the existing Yuen Long Nullah. The contract mainly comprises the provision of a barrage scheme in Yuen Long including the construction of an automatic flood barrier of about 60m, a stormwater pumping station, a master control centre and the associated electrical and mechanical facilities in the Yuen Long Nullah, about 200m drainage channels, about 4km flood walls, revitalization of a section of about 1km of the Yuen Long Nullah, and carrying out ancillary works.
- Responsibilities:
- Assessment of ECI Stage 1 benefits and recommendation to proceed to Stage 2
- Contractor’s design compliance
- Supervise barrage scheme construction process
- Management of project interface
- All commercial matters
- Dispute avoidance and resolution
- AECOM
- Senior Resident Engineer
Design and build contract
Kai Tak Development – Stage 4 Infrastructure at the Former Runway and South Apron
(Contract Sum: HK$1,480 Millions – ~GBP148 Millions)
The main objectives of the works are to provide essential infrastructure to serve the continued developments at the former runway and south apron of Kai Tak Development Area and to improve the overall road network in Kai Tak Development. The contract mainly comprises construction of Road D3 (Metro Park Section) including bridge, underpass and footpaths; salt water pumping station; sewage pumping station; open space and promenade.
- Responsibilities:
- Contractor’s design compliance
- Supervise infrastructure construction
- All commercial matters
- Dispute avoidance and resolution
- ARUP
- Resident Engineer
Design and build contract
Hong Kong – Zhuhai – Macao Bridge, Hong Kong Link Road – Section between Scenic Hill and Hong Kong Boundary Crossing Facilities
(Contract Sum: HK$8.8 Billions – ~GBP880 Millions)
This project involves construction of the Hong Kong Link Road connecting the main bridge and the Hong Kong Port. The Hong Kong Link Road comprises sea viaducts in the western waters of Hong Kong, tunnels through Scenic Hill and underneath the Airport Road and Airport Express Link, and at-grade roads on reclamation along the east coast of Airport Island.
- Responsibilities:
- Contractor's design compliance
- Tunnel construction
- Enhanced site safety supervision on construction work
- Commercial matters
- Dispute avoidance and resolution
- ARUP
- Resident Engineer
Design and build contract
Salt Water Supply System for Pok Fu Lam Area
(Contract Sum: HK$190 Millions – ~GBP19 Millions)
The system provides a new salt water supply system serving the Pok Fu Lam area.
- Responsibilities:
- Outstanding and defective works rectification
- Contractor’s design compliance
- System commissioning process
- All commercial matters
- Dispute avoidance and resolution
- Arbitration
- AECOM
- Resident Engineer
Tuen Mun Western Trunk Sewerage Project
(Contract Sum: HK$711 Millions – ~GBP71 Millions)
Construction of Western Interceptor Sewage Pumping Station and approx. 6km long Western Interceptor Sewer consisting 2.5 km long x DN1800mm diameter gravity sewer by tunnel boring machine, 1.5km long DN900 HDPE twin rising mains with DN1400 sleeve pipe, and 2km long twin cell box culvert.
- Responsibilities:
- Supervise system construction
- Contractor’s design compliance
- All commercial matters
- Dispute avoidance and resolution
- Black & Veatch
- Resident Engineer
Yuen Long, Kam Tin, Ngau Tam Mei and Tin Shui Wai Drainage Development
(Contract Sum: HK$123.9M)
Construction of 4.3 kilometers long urban drainage channels and ancillary works in Yuen Long and Kam Tin areas.
- Responsibilities:
- Supervise system construction
- Contractor’s design compliance
- All commercial matters
- Dispute avoidance and resolution
- Black & Veatch
- Engineer
Drainage Improvement in Northern Territories – Design and Construction (Project Cost: HK$266.6M)
Yuen Long, Kam Tin, Ngau Tam Mei & Tin Shui Wai Drainage Improvement, Cheung Chun San Tsuen and Kam Tsin Wai (Project Estimate: HK$122.6M)
Drainage Improvement in East Kowloon – Design and Construction (Project Cost: HK$175.1M)
Development in Yuen Long District, Kau Hui Development
Development in Yuen Long District, Lau Fau Shan Development – Hang Hau Tsuen Channel at Lau Fau Shan
- Black & Veatch
- Assistant Engineer
Yuen Long South Development (Contract Sum: HK$298M)
Yuen Long Development (Contract Sum: HK$98M)
Main Drainage Channels for Yuen Long and Kam Tin
LPG Stations in Mei Foo and Tuen Mun
Regulation of Shenzhen River
Reprovision of Conveyor Belt across Shenzhen River
Independent Checking Engineer – Construction of Trunk Road T7 at Ma On Shan