Ir Albert YEU

Mediation, Arbitration, Construction Adjudicator

Work History

Design and build contract, with early contractor involvement Yuen Long Barrage and Nullah Improvement Schemes (DSD Contract No. DC/2022/03, Contract Sum: HK$3,003 Millions)

The main objectives of the works are to bring the flood protection level of Yuen Long Town Centre to the required standard. It also provides the opportunity to revitalize the existing Yuen Long Nullah. The contract mainly comprises the provision of a barrage scheme in Yuen Long including the construction of an automatic flood barrier of about 60m, a stormwater pumping station, a master control centre and the associated electrical and mechanical facilities in the Yuen Long Nullah, about 200m drainage channels, about 4km flood walls, revitalization of a section of about 1km of the Yuen Long Nullah, and carrying out ancillary works.

Design and build contract Kai Tak Development – Stage 4 Infrastructure at the Former Runway and South Apron

(CEDD Contract No. ED/2018/01, Contract Sum: HK$1,480 Millions)
The main objectives of the works are to provide essential infrastructure to serve the continued developments at the former runway and south apron of Kai Tak Development Area and to improve the overall road network in Kai Tak Development. The contract mainly comprises construction of Road D3 (Metro Park Section) including bridge, underpass and footpaths; salt water pumping station; sewage pumping station; open space and promenade.

Design and build contract
Hong Kong – Zhuhai – Macao Bridge, Hong Kong Link Road – Section between Scenic Hill and Hong Kong Boundary Crossing Facilities

(HyD Contract No. HY/2011/03, Contract Sum: HK$8.8 Billions)
This role involved supervision of design and construction of 1 kilometer long cut-and-cover tunnels founding on pre-bored H-piles and minipiles, and tunnel construction by mined method. The tunnels comprise 3-lanes eastbound carriageway heading to HKBCF and 4-lanes westbound carriageway heading to the HZMB Main Bridge. Also responsible for claims assessment, preparation of VO, VVO and RFA.

Salt Water Supply System for Pok Fu Lam Area
(WSD Contract No. 10/WSD/09, Contract Sum: HK$190M)

This role involved supervision and handing over of outstanding works, defects rectification, contract finalization and dispute resolution process

Tuen Mun Sewerage Project
(DSD Contract No. DC/2009/11, Contract Sum: HK$711M)

This role involved supervision of the construction of 2.5 kilometers long, 1800mm diameter gravity sewer by tunnel boring machine, and handling of contractual matters including claims, valuations, supplementary agreements and dispute resolution process.

Yuen Long, Kam Tin, Ngau Tam Mei and Tin Shui Wai Drainage Development
(DSD Contract No. DC/2006/02, Contract Sum: HK$123.9M)

This role involved supervision of the construction of 4.3 kilometers long urban drainage channels and ancillary works, and dealings of contractual matters including claims and valuations.

Agreement No. CE 6/2002 (DS) – Drainage Improvement in Northern Territories – Design and Construction – Package C Phase 1 and Phase 2 (Project Estimate: HK$266.6M)

Detailed design of 7 kilometers long drainage channels at Fanling following the Stormwater Drainage Manual and Structural Design Manual for Highways and Railways, project gazetting under Road
(Works, Use and Compensation) Ordinance and Land Resumption Ordinance, and tender evaluation.

Agreement No. CE 67/98 – Yuen Long, Kam Tin, Ngau Tam Mei & Tin Shui Wai Drainage Improvement, Stage 1- Design and Construction – Phase 2B – Cheung Chun San Tsuen and Kam Tsin Wai (Project Estimate: HK$122.6M)

Detailed design of 2.1 kilometers long drainage channels at Kam Tin following the Stormwater Drainage Manual and Structural Design Manual for Highways and Railways, design of maintenance access road
for drainage channel following the TPDM, drafting of contract documents (Contract Sum HK$123.9M)

Agreement No. CE39/2002 (DS)-Drainage Improvement in East Kowloon – Design and Construction – Package C (Project Cost Estimate:
HK$175.1M)

Design of drainage network in east Kowloon following the Stormwater Drainage Manual, preparation of tender document and drawings, preparation of project risk assessment report and assessment of liquidated damages.

Agreement No. CE 3/74-Development in Yuen Long District (Stage 1), Kau Hui Development, Engineering Works in Area 16, Yuen Long, Phase 2 – Extension of Road L3

Design of a 250 metres long single carriageway following the TPDM, preparation of project cost estimate and drainage and traffic impact assessments

Agreement No. CE 3/74-Development in Yuen Long District (Stage 1), Lau Fau Shan Development – PWP Item No. 705CL – Hang Hau Tsuen Channel at Lau Fau Shan

Drainage impact assessment review, design of main drainage channel following the Stormwater Drainage Manual and Structural Design Manual for Highways and Railways, design of maintenance access road for drainage channel following the TPDM.

Yuen Long South Development, CEDD Contract No. YL 53/02 (Contract Sum: HK$298M)

  • Site supervision (roads and drainage works)
  • Checking Contractor’s submissions, temporary works proposals and interim payments
  • Liaison works with others such as utility undertakings, government departments, other contactors of interface works, local villagers
  • Resolving complaints
  • Preparation of variation orders and assessment of EoT claims
  • Attending traffic management liaison group meeting and monitor traffic diversion works
  • Safety and environmental issues

Yuen Long Development, TDD Contract No. YL 48/99 (Contract Sum: HK$98M)

  • Site inspection (open channel, roads and drainage works)
  • Checking Contractor’s submissions, proposals and interim payments
  • Liaison works with the others such as utility undertakings, government departments and local villagers
  • Resolving complaints
  • Preparation of variation orders and claims assessment
  • Handover of completed works
  • Site safety and environmental inspection

Main Drainage Channels for Yuen Long and Kam Tin Stage 2 – Remainder
Structural design of footbridges and vehicular bridges across main drainage channel, preparation of tender assessment report, bills of quantity and cost estimates.

LPG Stations in Mei Foo and Tuen Mun
Drainage and sewerage design, structural design of general office.

Regulation of Shenzhen River Stage III, Phase II
Structural design of two storeys guardhouse, preparation of tender drawings, bills of quantity and cost estimate.

Reprovision of Conveyor Belt across Shenzhen River
Structural design of 100m long conveyor belt with computer structural program SAP2000, preparation of bills of quantity and cost estimate.

Independent Checking Engineer – Construction of Trunk Road T7 at Ma On Shan
Checking temporary works for construction of pedestrian subway, retaining wall, noise barrier, box culvert, temporary cut slopes, temporary roads, vehicular bridges sub-structures, drainage and sewerage diversions, traffic sign gantries.